Moving an office over one long weekend
A 22-person firm left Friday at noon and opened Tuesday at nine in a new building, and almost all of the work happened months before.
- Words
- June Whitaker
- Filed
- Read
- 5 min
At noon on the Friday before a summer long weekend, Marcus sent the last email from his firm’s old office: the phones are forwarded, the servers are going dark, see you Tuesday. His accounting practice — 22 people, a server closet, forty boxes of files they were legally obliged to keep and one very large plant — was moving eleven blocks across downtown Halifax. By nine on Tuesday, every desk was up, the phones rang at the new address, and the plant had a better window.
Marcus is a composite of several business owners I have helped move over the years, but the weekend is typical. A small office can absolutely relocate over a long weekend. The catch is that the weekend is the shortest part of the job. What made his three days work was the four months before them.
Start with the lease, not the movers
The first planning session was not about trucks. It was about two leases. The old lease set the date Marcus had to be out and what condition he had to leave the space in. The new lease set when he could get access to the new suite for fit-out and furniture, and when rent would start. Ideally those overlap, so there is a period where you can install cabling and furniture in the new space before you leave the old one. In Marcus’s case, his broker negotiated six weeks of early access before the rent commencement date, which meant the new suite was largely ready before a single box moved.
If the dates don’t overlap, you may need a short extension at the old space. Leases often charge a premium for holding over past expiry, sometimes significantly above the regular rent, so it is cheaper to negotiate an extension in advance than to overstay.
Read your restoration clause early
Many leases require tenants to remove their fixtures, cabling or improvements and restore the premises at the end of the term. Find out what yours requires months before moving day, because that work has to be scheduled too. A lawyer can confirm what the clause obliges you to do.
The four-month countdown
Once the dates were fixed, Marcus’s office manager, Priya, built a schedule backwards from the long weekend. The order matters more than the exact timing, and every firm’s will differ, but the shape was roughly this.
-
Four months out: internet and phones
Order the new internet service and phone number transfer first. Getting a new circuit into a building can take weeks, and in some buildings much longer. This is the item most likely to sink a weekend move.
-
Three months out: movers and building rules
Get written quotes from at least two commercial movers, and ask both buildings for their move rules: elevator booking, loading dock hours, required insurance certificates and any after-hours or holiday charges.
-
Two months out: furniture and cabling
Decide what furniture moves and what is replaced. Have network cabling and power installed in the new suite during the early-access period.
-
One month out: purge and label
Shred, archive or dispose of what you don’t need, following your record-keeping obligations. Give every person a floor plan and a colour-coded labelling system tied to their new desk.
-
One week out: test and tell
Test the new internet connection, update your address with clients, suppliers and your bank, and confirm the elevator bookings in writing.
The weekend itself
Friday afternoon was packing and shutdown. Each person packed their own desk into a set number of crates, labelled with their new desk number. The IT contractor took the server and network gear down at five, while the old building’s internet was still live for a final backup.
Saturday was the truck day. The movers had booked the freight elevator in both buildings for the full day; both landlords required a certificate of insurance from the moving company naming the landlord, which Priya had collected two weeks earlier. A long weekend is useful here because building traffic is light, but some buildings charge extra for security or elevator operators on holidays, so get those costs in advance. By late afternoon, every crate was in the new suite, stacked by desk number.
Nobody remembers the truck. Everybody remembers whether the internet worked on Tuesday morning.
Sunday belonged to IT. Servers racked, network switched on, printers connected, phones tested by calling each extension. Priya walked the floor with a checklist: every desk had power, a network port, a chair and its crates. Monday was a buffer day, which they used for a few missing cables and a mislabelled box of tax files that had ended up in the kitchen.
What it cost, and what it saved
Costs vary a great deal by city, volume and building, so treat these as illustrative proportions rather than prices. For a move like Marcus’s, the largest single cost was not the movers but the cabling and IT work, followed by new furniture where the old pieces didn’t fit the new layout. The movers themselves were a smaller line than he expected. The holiday elevator surcharge was small but irritating, because nobody had asked about it until the final week.
What the long weekend saved was harder to see on an invoice: no lost working days, no week of half the team at home without files, no clients told “we’re in transition.” For a professional practice that bills by the hour, that alone justified the planning effort.
If you are planning your own
Marcus says the move was the most organized thing his firm has ever done. Priya says it was the most organized thing she has ever done, and that she would like it on the record that the plant survived.
Sublet or sit tight: the empty-desk problem
The Monday memo · free
Subscribe for the Monday memo
One long read, three clauses worth knowing and a note on the market, every Monday morning.
( Tap to say yes )